In order to progress your enquiry for a clean water point of connection for your proposed development, please ensure that this form is completed. Insufficient information will result in delays and difficulties in assessing your proposals.
* Company and self lay options will be provided
The company will provide:* Copy of the public records* Point of connection* Desk-top estimate of charges
The Point of Connection information will be provided within 28 calendar days of receipt of full application. The Site Served information will be provided within 21 calendar days of receipt of full application. The day of receipt is day 0.
The NAV Point of Connection process provides the customer with the point of connection/discharge for the site they are looking to develop and a budget estimate of the costs to supply them. Further information regarding this process can be located in the New Connections and Developer Services - Charging Arrangements.https://www.bristolwater.co.uk/business-developers/charges-regulations/* Contestable activity: the review can be undertaken by you/your contractor/your consultant.* Non-contestable activity: the review can only be undertaken by the company.Other company options for connection:If the customer wishes for the company to investigate the possibility of connecting to another main which does not fulfill the criteria for options above and requires hydraulic modelling, the company will look for the customer to fund the work.On request for this service, the company will provide a quote for the work and payment will be required before any work is undertaken. As part of the quote, timescales will be provided on when the customer can expect to receive the outcome of the work.
The plan must indicate North point Proposed entrance to the site Proposed water main entry point
Note: Failure to include any of the requested information may result in delays or return of the incomplete application.
I/We agree, that for the purpose of the Water Industry Act 1991 and the Data Protection Act 1998, the information provided in this form and in any supporting documents, may be held on a computer and processed. by Bristol Water and its servants and agents for all purposes connected with the Company’s statutory water undertakings.Please complete this section in block capitals:
Contamination and site issuesWe must safeguard against contamination of water supplied through our pipes. The supply pipe should not be laid in, on, or pass through any areas which might cause contamination including the following: foul soil, refuse and refuse chutes, ash pits, sewers, drains, cesspools or inspection chambers.Where the ground is classified as contaminated (e.g. reclaimed land sites), or the supply pipe is close to a petrol or oil source, an alternative pipe material is used. A soils report may be required to determine the type of pipe material that should be installed.We ask that you share any information you have of known issues that may affect the feasibility and/or timescales for providing a bulk supply to the NAV site.Traffic ManagementWe are required to carry out traffic management to ensure that our work can be carried out in a safe way, and to ensure the flow of road and pedestrian traffic is disrupted as little as possible. Traffic management can include, but is not limited to: road closures, lane closures, lane rental, parking bay suspensions, and traffic management drawings.Parking bays, including residential bays and loading bays, may be suspended for us to be able to work safely. The number of bays on either side of the road will be determined by us and our contractor, and depends on the width of the road, the location of the water main, and the flow of traffic around our works and vehicles.We are charged for traffic management by the local authority as an additional cost for carrying out work. We will include these additional charges into your quotation where applicable.DesignThere is a charge of £944 + VAT for the design of a branch connection for a NAV scheme, where no other design is undertaken. Should an application not proceed past the quotation stage, Bristol Water will charge a design fee.